Toilet renovation: to Begin

The bathroom is an area with special states: high humidity, temperature differences. That’s why making fixes in the bathroom, you need to clearly plan the entire operating process, to consider the sequence of steps to be performed. Within this report, you will learn where to start the fix in the restroom and what kinds of work ought to be performed with your hands. Step-by-step directions for bathroom repair

Phase 1: Establishing a plan and picking a layout solution.

Fix in the toilet can be of two types:

  • Unplanned, spontaneous, originating from the will of unexpected circumstances. For instance, in the event of a pipe burst, flooding with neighbors.
  • Planned, that can be either capital or cosmetic. It requires planning, serious monetary investment and time.

Begin repairs at the bathroom is to find out the design, interior. Think through the last detail, what will be the space, select a colour. Pastel colours are conventional, in addition to a mix of blue and blue, or peach with beige.

Begin repairs at the toilet is to ascertain the design, interior design. Think in detail, what will be the space, select a colour. Pastel colours are thought to be traditional, in addition to a combo of colours.

The next point is that the choice of facing substance. Generally, finishing at the toilet is done with vinyl, porcelain tiles, mosaic, vinyl panels. Check the pipes, if it has to be replaced. If needed, choose the right choice. Proceed to the measuring work: step all sides, calculate the area of the area. Based on these information, we mark the location of the plumbing fittings.

Measure 2: the choice of sanitary fixtures and substance for finishing.

It is crucial to see that the purchase of sanitary ware precedes the preparation stage, and not vice versa. This means that first we develop a new design project, create a plan, and then go to the shop. The following point – you need to specify the size of your favorite plumbing fixtures and check the program, whether it matches.

It is very important to recognize that the cost of plumbing fixtures is preceded by a planning period, rather than vice versa. This means that first we create a new design project, create a plan, then go to the store. Another one

In terms of stuff for finishing, it is preferable to buy them instantly for the whole repair cycle, and that you won’t be vsyakuhnya.ru distracted if something was missing. Remember about preparing the necessary tools.

Step 3: dismantling tiling and plumbing.

After all the preliminary work is completed, move on to the Start of the work process:

  • Remove the sink and bathtub from the space, even though they won’t be replaced with fresh ones. In this manner, you may keep them clean and undamaged.
  • Remove the old tile, cleaning after it all surfaces: walls, ceiling, floor.
  • Remove old paint from the walls, even if they had been previously painted, because the glue solution or a fresh layer of paint will not stick to surface.

Measure 4: Cost of communications: pipes, electrical wiring.

Quite frequently in an older house, you should carefully inspect and replace not just the pipes that are in the toilet itself, but also the major riser, and on occasion the interfloor plumbing. Why is it worth doing this? Old pipes anytime can give a leak, then the new repair is going to be spoiled, it will call for additional investment to get rid of flaws.